PHE ONWJ – STC0885 IRM Sat Diving 2014 Campaign

DETAIL PROJECT
Project
PHE ONWJ - STC0885 IMR SAT DIVING Campaign 2013
Client
PHE ONWJ
Location
Offshore North West Java
Duration
53 days
Year
November 2013
Mode of Intervention
Saturation Diving Services
Water Depth
40-45m
WORKSCOPE SUMMARY

PHE ONWJ is undertaking a project involving two diving campaigns within the ONWJ PSC area. The intention is to perform repair and maintenance activities in line with the 2013/2014 Subsea Inspection (IMR) program. The scope of work will be carried out under the Subsea Platform, Pipeline Inspection, Maintenance and Repair with Saturation Diving contract STC 0885 between PHE ONWJ and OSI.

The scope of work includes, installation engineering review, procurement of consumables and installation of company supplied equipment and structures.The scope of work consisted of:

  • CP System Retro Fit – Anode Pod Installation (2013/2014)
  • Scour Rectification – Frond Mattress Installation (2013/2014)
  • ZUD Sectional riser replacement (Fixed Shutdown Window) (2014)
  • LC-LPRO Sectional replacement (Fixed Shutdown Window) (2014)
  • Emergent works and additional ‘requests’, which shall be covered by MOC if required.